CNC production machine operating inside the YINGBA carving tools factory

Quality Control

Checks linked to the approved tool specification.

Inspection requirements are confirmed for each order, from dimensions and flute structure to surface condition, marking and packaging.

01   Specification

02   In-process

03   Final Check

CE Attestation of Conformity for Jinan YINGBA Carving Tools Co., Ltd. milling cutters
Open the certificate image to view the original details.

CONFORMITY DOCUMENTATION

CE Attestation of Conformity

YINGBA holds an Attestation of Conformity covering the referenced milling cutter product. The document records the applicant, product, applicable standard and Machinery Directive reference.

  • Verification No.: TD37962401
  • Product: Milling cutter
  • Reference standard: EN ISO 12100:2010
  • Directive: 2006/42/EC Machinery Directive
  • Issue date: 19 March 2025
  • Expiry date: 18 March 2031

The document is displayed as issued. Product-specific applicability and current documentation can be confirmed during quotation and order review.

01 / ORDER & DRAWING REVIEW

Before production: turn the enquiry into an approved specification.

We align the commercial request and technical details before production begins, reducing ambiguity in geometry, application, inspection and delivery.

Tool geometry

Diameter, flute length, overall length, shank and flute structure.

Application

Target material, CNC setup, cutting direction and required finish.

Customization

Coating, marking, packaging, private label and OEM requirements.

Inspection plan

Tolerances, sampling, report format and traceability needs.

Production starts after the commercial and technical scope is confirmed.

Wide view of YINGBA five-axis CNC tool grinding production line

Production planning is based on the approved drawing, application and order requirements.

YINGBA high-precision five-axis CNC tool grinding machine and control system

Process checks follow the approved order specification. Exact tolerances, sampling frequency and documentation are confirmed separately for each project.

02 / IN-PROCESS CONTROL

During production: control the geometry, process and non-conforming items.

The production route is managed around the confirmed tool specification, with checks at relevant stages before the order moves forward.

01

Material preparation

Prepare the carbide rod and production inputs for the approved tool design.

02

Five-axis grinding

Grind the specified flute geometry, cutting edge and overall tool form.

03

Process checks

Review relevant dimensions, cutting edges and surface condition.

04

Segregation & review

Separate any item that does not match the approved requirement for review.

03 / FINAL VERIFICATION & RELEASE

Before shipment: verify the order before release.

The finished order is checked against the confirmed requirements before shipment. Product-specific tolerances and requested records remain linked to the individual project.

Automated loading robot inside a YINGBA CNC tool grinding cell

01 / PRODUCT

Dimensions & appearance

Review the agreed dimensions, cutting edge and visible surface condition.

02 / ORDER

Quantity & marking

Verify quantities, model identification and confirmed branding or laser marking.

03 / PACKING

Packaging & labels

Confirm the agreed protection, labels, inner packing and carton requirements.

04 / RELEASE

Documents & release

Prepare agreed inspection or traceability information before shipment release.

What to send with an enquiry

Drawing or specification · target material and application · tolerance table · inspection template · packaging standard · marking and traceability format.

QUALITY & CUSTOMIZATION BRIEF

Put the quality requirements into the quotation—not after production.

Send the information available to your team. YINGBA will review the tool specification, customization scope and requested verification before confirming the order.

Recommended enquiry files

  • Tool drawing or size specification
  • Target material and cutting application
  • Tolerance and inspection format
  • Logo, packaging and traceability needs

If a formal inspection template is not available, describe the critical dimensions and acceptance requirements in the enquiry.